Andean Duct Flutes Build Packet Print Packet

Generated: 2026-05-09

Packet folder: `/tmp/andean-duct-flutes-codex-bob-r3-build-packet`

File Map

FilePurpose
`design.md`Project intent, catalog metadata, assumptions, and validation plan.
`bom.csv`Starter bill of materials with part categories, quantities, drawing refs, and notes.
`sourcing.csv`Supplier/search tracker with specs, price/date fields, lead time, substitutes, and risks.
`cut-list.csv`Rough/final stock sizes, material, grain/orientation, operations, yield, and offcuts.
`drawing-brief.md`Manufacturing drawing and technical product sketch brief.
`assembly-manual.md`Shop-facing sequence, tools, fixtures, safety, tuning, finishing, and maintenance notes.
`validation.csv`Target/measured values, tolerance, environment, result, and tuning/build action log.
`supplier-rfq.md`Supplier email/request-for-quote starter.
`visual-bom-brief.md`Art direction for an image-forward visual BOM.
`andean-duct-flutes-starter.wl`Wolfram starter for physics, optimization, visualization, and validation.
`CHECKLIST.md`Project artifact.
`README.md`Project artifact.
`family-spec.csv`Project artifact.
`jig-decision.md`Project artifact.
`photo-shotlist.md`Project artifact.
`resources.md`Project artifact.
`review-evidence.md`Project artifact.
`risks.md`Project artifact.

design.md

Project intent, catalog metadata, assumptions, and validation plan.

Design

Design Intent

Create an L2 root-mode build packet for a small family of Andean duct flutes

that can be prototyped with PVC before committing to hardwood or bamboo. The

first prototype is a G4 pinkullo-style fipple flute with a removable block so

the windway, window, and labium can be tuned independently from the tube.

This packet supports issue #1 by providing a reviewable shop candidate. It does

not claim L3/build-ready status until the first prototype speaks cleanly and

the tuning rows in `validation.csv` are filled with measured data.

Governing Model

The starting acoustic model is an open-open pipe:


f = c / (2 * L_eff)
L_eff = L_physical + 2 * 0.6 * radius
c = 13552 in/s at 68 F

Tone-hole first pass:


distance_from_foot = acoustic_length * (fundamental_hz / hole_hz)

The formula sizes the bore and first-pass holes only. The duct-flute voicing is

empirical: windway height, window length, block fit, labium edge quality, and

breath pressure determine whether the pipe speaks.

Prototype Family

MemberMusical roleFundamentalBore IDPhysical lengthScale path
Pinkullo G4First prototype392.00 Hz0.625 in16.1 inpentatonic minor first
Tarka A4Higher, brighter test440.00 Hz0.562 in14.3 inpentatonic or hexatonic
Small duct flute C5Short proof body523.25 Hz0.500 in11.9 inpentatonic minor

Physical lengths include first-pass end correction and 0.25 in trimming

allowance. They are deliberately long until measured tuning confirms the

block/window behavior.

Duct And Window Starter Geometry

FeatureG4 starterValidation note
Windway height0.040 inShim down if breath is noisy; open slightly if it chokes
Windway width0.50 inAbout 80% of bore ID
Window length0.45 inFile after first sound
Labium angle35 degKeep edge crisp and centered
Block insertion1.00 inWaxed fit for removable first prototype
Window setback from head0.75 inMark from head datum before cutting

Scale Options

Pentatonic minor offsets are the first tuning target: `0, +3, +5, +7, +10,

+12`. A hexatonic/diatonic test can be drilled on a sacrificial PVC body after

the pentatonic body validates the duct geometry. Do not mix scale experiments

with the first voicing validation body.

Materials

SolidWorks/OpenSCAD Handoff

This packet does not include production CAD. The first geometry handoff should

be a simple axisymmetric bore plus rectangular window/block model with named

inputs for bore ID, OD, body length, window length, windway height, and hole

stations. CAD should not be treated as final until the G4 PVC body validates

the windway/window relationship.

L2 To L3 Gates

not practical.

5 cents.

bom.csv

Starter bill of materials with part categories, quantities, drawing refs, and notes.

itemqtyunitestimated_costnotes
PVC proof tube 0.625 in ID2eachderived estimate 12Measure actual ID before calculating length
Cherry or maple blank 1 x 1 x 24 in1eachderived estimate 18Hardwood follow-up after PVC validates voicing
Cedar or maple block stock3blanksderived estimate 6Removable fipple blocks and spares
Beeswax/paraffin sealing wax1small blockderived estimate 4Temporary leak sealing and block fit tests
Small cork/rubber sheet1sheetderived estimate 5Optional block shims
Sandpaper 220-600 grit1setderived estimate 8Labium edge and finish
Mineral oil or shellac1small bottlederived estimate 10Final finish after tuning

sourcing.csv

Supplier/search tracker with specs, price/date fields, lead time, substitutes, and risks.

itemrequired_specsearch_termspreferred_sourcecurrent_check_neededsubstitution_notes
PVC proof tubemeasured 0.625 in ID or closest stable tuberigid pvc tube 5/8 idlocal hardware or plastics supplieryesUse measured ID in design table
Hardwood blankstraight grain 1 x 1 x 24 in cherry maple or walnutcherry turning blank 1x1x24wood supplieryesOnly after PVC duct geometry is validated
Block stockdry cedar maple or Delrin insert stockcedar block stock delrin rodshop scrap or plastics supplieryesMust fit airtight and remain removable
Waxbeeswax or paraffin for temporary sealingbeeswax block paraffincraft or hardware storeyesUsed for leak tests not final glue
Finishnon-toxic oil or shellacfood safe mineral oil shellac flakeswoodworking supplieryesApply after tuning is stable

cut-list.csv

Rough/final stock sizes, material, grain/orientation, operations, yield, and offcuts.

partqtymaterialrough_dimensions_infinal_dimensions_inoperation_notes
G4 PVC body2PVC tube0.875 OD x 17.0 long0.875 OD x 16.10 long plus trimLeave 0.25 in extra until tuning
G4 hardwood body1cherry or maple1.00 x 1.00 x 18.00.875 OD x measured tuned lengthBuild only after PVC validation
Removable block blanks3cedar maple or Delrin0.60 x 0.60 x 1.25fit to bore x 1.00 longPlane/sand to airtight slip fit
Fipple window coupon3same as body stock2.0 long offcutswindow test couponsPractice window and labium before body cut
Hole-layout story stick1plywood or acrylic1.0 x 18.0marked stations from foot datumUse for drilling repeatability

drawing-brief.md

Manufacturing drawing and technical product sketch brief.

Drawing Brief

Required Sheets

1. Overall G4 body elevation with head datum, foot datum, window setback, and

all tone-hole stations.

2. Bore and block section showing removable fipple block, windway height, and

leak-control surfaces.

3. Window/labium detail with windway width, window length, ramp angle, and edge

note.

4. Drill jig/story-stick layout for repeatable hole placement.

Datum Scheme

All tone-hole stations are measured from datum B. Window and block dimensions

are measured from the head end and cross-checked to datum A.

Tolerance Notes

adjustable on the drawing.

assembly-manual.md

Shop-facing sequence, tools, fixtures, safety, tuning, finishing, and maintenance notes.

Assembly Manual

Scope

This manual covers the G4 PVC proof-of-tune body. Hardwood or bamboo bodies

should copy only the measured geometry from a successful PVC prototype.

Steps

1. Measure the tube ID, OD, and straightness at three stations.

2. Cut the body 0.25 in long and square both ends.

3. Mark the head datum, window setback, and foot datum.

4. Cut a conservative rectangular window and leave the labium edge slightly

heavy for hand finishing.

5. Fit a removable block so the windway is centered and airtight.

6. Shim or sand the windway toward the 0.040 in starter height.

7. Form the labium ramp to about 35 degrees and sharpen the edge.

8. Play first sound before drilling any finger holes.

9. Adjust window length and windway height until response is repeatable at low

and medium breath pressure.

10. Drill tone holes undersize from the foot upward.

11. Tune by gradual enlargement, recording final diameters in `validation.csv`.

12. Trim the foot only after the scale is stable.

13. Photograph the block, window, labium, and final hole layout for the build

log.

Stop Conditions

the body.

drilling tone holes.

validation.csv

Target/measured values, tolerance, environment, result, and tuning/build action log.

checktargetmethodtoolactualpassnotes
Actual bore ID0.625 in +/- measured toleranceinside caliper at three stationsdigital caliperpendingpendingRecalculate length if tube ID differs
First sound responsestable tone at low and medium breathplay test with same playershop notespendingpendingRecord breath-pressure bin
Fundamental G4392.00 Hz +/- 15 cents before trimchromatic tuner at 68 FtunerpendingpendingTrim foot after block/window settle
Pentatonic hole 1+3 semitones from fundamentaldrill undersize then enlargetunerpendingpendingTune from foot upward
Pentatonic hole 2+5 semitones from fundamentaldrill undersize then enlargetunerpendingpendingLog hole diameter after tuning
Pentatonic hole 3+7 semitones from fundamentaldrill undersize then enlargetunerpendingpendingWatch cross-fingering leakage
Pentatonic hole 4+10 semitones from fundamentaldrill undersize then enlargetunerpendingpendingKeep ergonomic reach under review
Octave response+12 semitones accessible with breath shiftplay testtunerpendingpendingDo not overclaim until repeatable
Block reinstall repeatabilitywithin 5 cents after removal/reinstalltuner before/aftertunerpendingpendingReject loose block fit
Leak checkno audible leak around block or windowsoap bubble or breath holdvisual/play testpendingpendingWax temporary leaks before final fit

supplier-rfq.md

Supplier email/request-for-quote starter.

Supplier RFQ

Request

Please quote the following public-safe, non-proprietary instrument-build

materials or fabrication services.

Items

visual-bom-brief.md

Art direction for an image-forward visual BOM.

Visual BOM Brief

Create a single-page visual BOM after the first prototype is cut. Required

image panels:

Each row should include quantity, material, final dimensions, and which

validation row confirms the part.

andean-duct-flutes-starter.wl

Wolfram starter for physics, optimization, visualization, and validation.


(* Andean duct flute starter: open-pipe length and first-pass holes. *)

ClearAll["Global`*"];

cInPerSec = 13552;
a4 = 440;
fundamentalHz = 392.0;
boreIn = 0.625;
radiusIn = boreIn/2;
endCorrectionIn = 2*0.6*radiusIn;

targetHz[midi_] := a4*2^((midi - 69)/12);
centsError[measured_, target_] := 1200*Log[2, measured/target];
physicalLengthForHz[f_] := cInPerSec/(2*f) - endCorrectionIn;

scaleOffsets = {0, 3, 5, 7, 10, 12};
scaleTable = Table[
  With[{f = fundamentalHz*2^(offset/12)},
    <|
      "OffsetSemitones" -> offset,
      "TargetHz" -> f,
      "DistanceFromFootIn" -> physicalLengthForHz[fundamentalHz]*(fundamentalHz/f)
    |>
  ],
  {offset, scaleOffsets}
];

Dataset[scaleTable]

(* Validation reminder: duct/window response is empirical and must be measured
   before this model is used for a hardwood or bamboo body. *)

CHECKLIST.md

Project artifact.

Public-Ready Checklist

Readiness Level

Only L3 or L4 work should be described as build-ready.

Packet Completeness

Review Evidence

README.md

Project artifact.

Andean Duct Flutes

> L2 root-mode build packet for a small Andean duct-flute family: pinkullo,

> tarka, and related fipple flutes.

![Hero photo placeholder](images/README-placeholder.txt)

What This Is

This repository documents a contemporary workshop build packet for Andean

duct flutes: block-and-window flutes where a windway directs the player's air

jet across a labium. The first build target is a **G4 pinkullo-style

prototype** because it is large enough to make the duct geometry forgiving,

short enough for common stock, and useful as a reference before lower tarka

members are attempted.

The packet is intentionally **L2, not L3**. It is ready for review as a

shop-packet candidate, but it is not build-ready until the windway, window,

breath pressure, and tuning data are measured on a physical prototype.

Refs #1.

Design Overview

TopicPacket decision
Governing modelOpen-open pipe first pass: `f = c / (2 * L_eff)`
Voicing modelDuct windway plus window/labium; empirical breath-pressure validation required
First prototypeG4 pinkullo-style duct flute
Scale optionsPentatonic minor first, hexatonic/diatonic variant after tone-hole validation
MaterialsPVC proof-of-tune body first; hardwood or bamboo second
Manufacturing pathDrill/ream bore, cut fipple window, fit block, drill undersize holes, tune by controlled enlargement

Why Duct Geometry Is The Center Of The Packet

The tube length equation only sizes the air column. The instrument will not

speak cleanly unless the duct and labium are tuned together:

response, not volume;

windway, not around the plug;

test is added.

Packet Map

PathPurpose
`design.md`Governing model, duct geometry, scale options, and assumptions
`family-spec.csv`G4/A4/C5 starter family with bore, length, window, and hole schedule summary
`bom.csv`Materials and tooling for PVC proof-of-tune plus hardwood follow-up
`sourcing.csv`Source/spec tracker; current prices still require live purchasing checks
`cut-list.csv`Body, block, test coupons, and jig blanks
`assembly-manual.md`Shop sequence from blank prep through first tuning
`validation.csv`Pitch, response, leak, and breath-pressure checks
`drawing-brief.md`Required drawing sheets and datum scheme
`visual-bom-brief.md`Visual BOM plate plan
`jig-decision.md`Drill V-block, fipple-window guide, and hole-layout fixture choices
`resources.md`Cultural and engineering reference plan
`risks.md`Acoustic, structural, ergonomic, sourcing, and finish risks
`andean-duct-flutes-starter.wl`Parametric frequency and hole-position starter

Build Order

1. Build PVC G4 proof-of-tune body and keep the duct block removable.

2. Establish repeatable first sound at low and medium breath pressure.

3. Drill tone holes undersize and tune from foot to head.

4. Record frequency and response data in `validation.csv`.

5. Transfer only the measured duct/window geometry to hardwood or bamboo.

Status

AreaStatus
Packet docsL2 root-mode candidate
Drawings/CADDrawing brief and starter fixture plan included
PhotosPlaceholder only
ValidationPlanned, no measured prototype yet
Issue linkageRefs #1, does not close #1

License

[CC BY 4.0](LICENSE) - engineering documentation only. This packet is a

contemporary workshop interpretation and is not a claim of cultural ownership.

family-spec.csv

Project artifact.

member_idnamefundamental_hzbore_id_inod_inphysical_length_inwindway_height_inwindway_width_inwindow_length_inlabium_angle_degscale_offsetsprototype_status
ADF-G4-P1Pinkullo G4 first prototype392.000.6250.87516.100.0400.5000.450350 3 5 7 10 12PVC proof-of-tune
ADF-A4-P2Tarka A4 high prototype440.000.5620.81214.300.0360.4500.400350 3 5 7 10 12queued after G4 voicing
ADF-C5-P3Small duct flute C5 proof body523.250.5000.75011.900.0320.4000.350350 3 5 7 10 12scale experiment body

jig-decision.md

Project artifact.

Jig Decision

OperationJig choiceReasonRelease check
Body drilling/holdingV-block with centerline fenceKeeps round tube stable without crushingTube cannot roll under hand pressure
Window cuttingClamp-on window guideProtects setback and square shouldersTest on coupon before body
Block fittingBore-matched sanding mandrelLets block fit be tuned graduallyBlock seals and can be removed
Tone-hole drillingStory stick plus V-blockFaster than CNC for L2 proof bodyStations match drawing within 0.02 in
Foot trimmingMiter box or lathe facingKeeps foot square during tuningEnd remains square after each trim

photo-shotlist.md

Project artifact.

Photo Shotlist

resources.md

Project artifact.

Resources

Cultural Context

This packet treats Andean duct flutes as living Indigenous and regional

instruments, not generic "folk flutes." Public-facing writing should identify

the specific form being built when known, such as pinkullo or tarka, and avoid

claiming authenticity for a workshop prototype.

Engineering References To Gather Before L3

Related Repos

discipline.

corrections do not transfer to this duct-flute packet.

review-evidence.md

Project artifact.

Review Evidence

Refs #1.

Round 3 Scope

duct-flute specifics: fipple block, windway, window/labium, breath pressure,

pentatonic-first scale validation, and PVC-to-hardwood/bamboo prototype path.

Gates Before Close

hole diameters, and cents error in `validation.csv`.

body.

risks.md

Project artifact.

Risks

IDCategoryRiskVerification testMitigation
ADF-AC-01AcousticDuct/window geometry does not speak below high breath pressureFirst-sound test before drilling holesKeep block removable; tune windway/window first
ADF-AC-02AcousticTone-hole formula misses because effective open point shiftsDrill undersize and log final diametersTune from foot upward and update design table
ADF-ST-01StructuralLabium edge chips in hardwoodCut window coupon firstUse PVC proof body and sharp tools
ADF-ER-01ErgonomicHole spacing is too wide on low memberPaper reach test and mock gripStart with G4 before lower tarka body
ADF-SU-01SupplyNominal PVC ID differs from formula assumptionsMeasure ID at intakeRecalculate length with measured bore
ADF-FI-01Fit/finishRemovable block leaks or shifts after reinstallTuner before/after block reinstallShim/wax block; reject loose fit