Record measured bore station IDs for the selected candidate.
Record cold pitch, warmed pitch, leak checks, and trim response in validation logs.
Promote a reviewed CAD, DXF, measured station table, or design table before claiming fabrication authority.
Verify breath-contact glue, wax, finish, dust, odor, tack, and cure safety before sustained play.
Verify purchase-time sourcing and material availability before treating BOM rows as actionable buys.
01 · OverviewDidgeridoo bare-bones starter packet
This explorer gathers the didgeridoo starter packet into a reviewable studio surface: stopped-pipe acoustic assumptions, workbook-derived planning rows, BOM and validation gates, bore-profile authority plans, photo documentation needs, and explicit blockers before any build-ready claim.
Readiness boundary
The packet remains L1_packet. It is useful for review and first measurement planning, but fabrication authority is unreleased until measured bore stations, pitch/leak logs, breath-contact safety checks, and reviewed CAD/DXF/design-table evidence exist.
Start here
design.mdA1 bell-flared candidate, stopped-pipe model, source basis, and measurement gates
Existing workbook, legacy CAD, and bore-profile notes are useful planning evidence. They do not release a cut-ready bore, stave layout, DXF, or OpenSCAD model until measured stations and reviewed geometry are promoted in the registers.
Bore register
CAD/bore-profile/bore-profile-register.csvcandidate and source tracking before authority promotion
· Run it — Wolfram CloudInteractive acoustic model
One embed per published Wolfram notebook. Live entries iframe in directly; Owner-only entries show as grey-dot blocks; Pending/Failed states are diagnostic-only.