- Record repeatable mic/FFT strike measurements for bass, open tone, and slap.
- Select one construction path before cut lists or jig drawings are treated as actionable.
- Promote reviewed CAD, DXF, drawing, or design-table authority before fabrication geometry claims.
- Verify BOM sources, dimensions, and safety factors at purchase and build time.
- Document head material, head diameter, rope/ring hardware, and tuning state for any acoustic claim.
Build target
stave-built djembe evidence map and validation starter · Djembe Bare-Bones Starter Packet
Focus
bare-bones packet for djembe acoustics evidence, construction decisions, and validation gates
Status
Private review Public-release blocked Packet version bare-bones readiness packet
Family
stave-built djembegoblet drummembrane percussion
Release gates
01 - OverviewDjembe Bare-Bones Starter Packet

This explorer is a studio index for the djembe repo's V5 starter packet. It connects the existing README, Helmholtz/FEM analysis, historical CAD/archive material, photos, BOM scaffold, validation loop, visual authority register, validation gates, and risks without upgrading the repo to build-ready status.
Readiness boundary
Fabrication geometry still requires reviewed CAD, DXF, drawing, or design-table authority. Acoustic claims still require repeatable mic/FFT strike measurements with documented head, shell, tuning, and room conditions.
· Repo artifactsDesign tables · research · source files
02 · CAD export queueglTF / GLB pending
Model-viewer asset needed
Source CAD exists, but no browser-renderable .glb or .gltf was found yet. Export the chosen SolidWorks assembly into the repo's CAD folder and rerun this generator; the explorer will then inline small .glb files automatically.
· Bill of MaterialsBill of Materials
· DesignDesign
· Validation GatesValidation Gates
· Risk RegisterRisk Register
· ImagesConcept renders

