# Visual BOM Brief

## Goal

Create a single-page visual BOM that helps a builder see the entire bagpipe as
an interacting pressure/reed/bore system before opening the spreadsheet.

## Required Panels

1. Full system hero: bag, chanter, two tenor drones, bass drone, blowpipe, and
   five stocks labeled.
2. Chanter exploded view: reed, reed seat, conical bore, tone holes, sole.
3. Drone exploded view: reed, bottom, tuning slide, top, cap/sound exit.
4. Bag interface: stock tie-ins, blowpipe valve, pressure path.
5. Maintenance parts: hemp, beeswax, spare reeds, manometer, tuner.

## Image Requirements

- Replace the current SVG system map with shop photos once parts exist.
- Photograph each reed next to calipers before fitting.
- Photograph one hemped joint before and after wax compression.
- Include a manometer photo during the pressure validation test.
- Avoid mood-board imagery; every image should identify a physical part or
  validation step.

## Layout

- Black-on-white shop-packet version.
- Separate recruiter/site version with the same labels and a single hero image.
- Every part label must map back to `bom.csv` item IDs.
