# Konghou Mule Photo Shotlist

Readiness: L2 scaffold. This shotlist is for documentation and review only; it
does not create fabrication authority or prove that the mule is safe under
string load.

## Required Before Public Build-Log Polish

Capture these photos after the matching measurement or review step exists:

| shot_id | stage | subject | evidence_needed | readiness_note |
| --- | --- | --- | --- | --- |
| KGH-PH-01 | pre-cut | full mule layout with scale ruler | reviewed DXF or measured full-size drawing | requires measurement before dimension captions |
| KGH-PH-02 | pre-load | neck rail, pin rail, and anchor path | hardware rating notes and string schedule | source needed for pin and string load claims |
| KGH-PH-03 | pre-load | bridge and soundboard interface | bridge footprint and crown baseline | TBD until measured baseline is recorded |
| KGH-PH-04 | proof-load | staged load setup | test weight or tension method and date | do not imply pass until validation.csv result is filled |
| KGH-PH-05 | post-load | neck lean and bridge lift measurement | straightedge/dial reading with humidity note | requires measurement before promotion |
| KGH-PH-06 | serviceability | tuning-tool and hand clearance | access notes for paired-course planning | paired-course spacing remains blocked |

## Caption Rules

- Use `assumption`, `TBD`, or `requires measurement` for unverified dimensions.
- Do not caption the DXF/OpenSCAD scaffold as build-ready geometry.
- Do not use generated concept images as evidence of string spacing, bridge
  location, bracing, soundboard crown, joinery, or load path.
- Keep any public image set behind the same gates as `validation.csv` and
  `frame-string-scaling.csv`.