# Photo Shotlist

## Provenance And Context

- Workbook open on the `Kora` sheet, showing the design source.
- Printed packet with private-review label visible.
- Material samples labeled as prototype substitutes, not traditional claims.

## Shop Process

- Hardwood stock before cutting.
- Miter sled setup at 15 deg.
- First 12-segment dry-fit ring.
- Full 14-ring stack before shaping.
- Rim dry-fit at 11.25 deg.
- Head material sample and rounded rim contact surface.
- Through-neck/spine dry fit through the bowl.
- Tail anchor proof-load setup with shielding.
- Bridge blank before notching.
- Bridge foot pad test set.
- Partial low-tension stringing.
- Tuner/measurement setup with temperature and humidity note.

## Detail Shots

- Bridge notches and bank separation.
- Tail anchor rounded contact surfaces.
- Head deflection at staged load.
- Neck deflection measurement point.
- Hand post mockup and player reach.
- Optional piezo test placement before drilling.

## Final Review Shots

- Front, side, and rear of private prototype.
- Player seated posture.
- Close-up of labels or notes that mark prototype/cultural-review status.
