Build target
OCARINA · Slip-Cast Ceramic Ocarina (OCA-001) — V5 explorer candidate
Status
V5 candidate Not build-ready
Family
Single vessel-flute target; Helmholtz model recorded in family-spec.csv with measurement-required caveats.
Release gates
- Measure fired clay shrinkage and water-fill chamber volume before freezing the slip-cast master scale.
- Validate
OCA-P1 fipple response and closed-chamber pitch before expanding the hole set. - Log measured frequency and cents error in
validation.csv through bisque and glaze-fire tuning passes. - Keep production CAD/STL release deferred until empirical voicing validation confirms the chamber, windway, and labium geometry.
01 · OverviewSlip-Cast Ceramic Ocarina (OCA-001) — V5 explorer candidate
This explorer is the studio-facing build packet for ocarina. Sections below cover the Helmholtz vessel-flute model, slip-cast build packet, BOM, validation log, Wolfram scaffold, risks, and capstone deliverables.
Authority boundary
Current fabrication authority is candidate-only. Chamber volume, voicing window, clay shrinkage, and tuning are inferred from the workbook/OpenSCAD starter or marked measurement-required until physical prototypes are measured.
· Repo artifactsDesign tables · research · source files
▶README.mdMDRepository narrativeOpen
▶bom.csvCSVDimension or registry tableOpen
▶cut-list.csvCSVDimension or registry tableOpen
▶sourcing.csvCSVDimension or registry tableOpen
▶validation.csvCSVDimension or registry tableOpen
▶family-spec.csvCSVVessel-flute model and authority ledgerOpen
▶visual-output-register.csvCSVCAD/design-table vs concept visual authorityOpen
▶validation-loop.csvCSVEmpirical close-the-loop checksOpen
Workbook
ocarina-design-table.xlsxocarina-design-table.xlsx
Open
· Bill of MaterialsBill of Materials
▶bom.csvCSVLine items · planning estimateOpen
▶cut-list.csvCSVStock + cut planOpen
▶sourcing.csvCSVSuppliers, lead times, ethical notesOpen
· DesignDesign
▶design.mdMDDesign narrativeOpen
· Assembly ManualAssembly Manual
▶assembly-manual.mdMDStep-by-step build sequenceOpen
· CNC & Drawings BriefCNC & Drawings Brief
▶drawing-brief.mdMDWhat needs to be drawnOpen
▶visual-bom-brief.mdMDVisual-BOM shot listOpen
▶cad/mcp-session-log.mdMDV5 provenance logOpen
· Validation GatesValidation Gates
▶validation.csvCSVChecks · methods · tolerances · gatesOpen
▶validation-loop.csvCSVPrototype measurement loopOpen
· Run it — Wolfram CloudInteractive acoustic model
One embed per published Wolfram notebook. Live entries iframe in directly; Owner-only entries show as grey-dot blocks; Pending/Failed states are diagnostic-only.
· Risk RegisterRisk Register
▶risks.mdMDRisk register with mitigationsOpen
· Capstone deliverablesDeck · print packet · explorer
Slide deck
capstone-deck.pptxWorkbook -> design -> BOM -> validation -> next actions
Open PPTX
Print packet
print-packet.pdfLetter-size print, take-to-bench reference
Open PDF · Open HTML
Manifest
capstone-manifest.jsonArtifact inventory; release gates; required-before-public list
Open JSON
Studio explorer
explorer.htmlThis document with V5 authority caveats.
Reload · Summary
· Supplier RFQSupplier RFQ
▶supplier-rfq.mdMDQuote requestsOpen